Home > Installation > Program Preferences > Project Tab

Project Tab


The screen shown in the Figure below is used to enter project options for the system.  Once the changes are made all NEW estimates will use the saved changes in the Project settings.  NOTE: Existing projects will not change.

 

 


COST TYPES

All Cost Types (8)

The standard (8) cost types of ProEstimate Heavy consist of Labor, Equipment, Sub/Supplier, Material, Supplies, Other, Indirect and Hauling.

Modified All (No Supplies)

Modified includes (7) cost types, same as All without Supply cost.

5 Cost Types

The (5) cost types which consist of Labor, Equipment, Material, Subcontractor, Supplies and Other.

Minimum (Other)

The Minimum includes (6) cost types which consist of Labor, Equipment, Material and Supplies, Subcontractor, Supplies and Other.



MARK-UP TYPES

Profit Only

Only Profit  is applied to cost to equal calculated bid price.

Overhead, Profit

Overhead +  Profit is appied to cost to equal calculated bid price.

Overhead, Profit, Other

Overhead + Profit + Other is applied to total cost to equal calculated bid price.


See also

General Tab
Backup Tab
Program Paths Tab
User Information Tab
Print/Export Tab
Email Tab