Hauling Worksheet |
allows you to enter hauling information (haul distances, haul speeds, load and unload times, loading and hauling equipment capacities), then assists you in determining crew production rates.
|
Blasting Worksheet |
allows you to enter various rock drilling information (drill patterns, drill production, and material types) then assists you in determining crew production rates and material quantities.
|
Trenching Worksheet |
allows you to enter pipe trench information (run length, pipe size, trench dimensions, bedding and slope information), then assists you in determining excavation, bedding stone and backfill quantities.
|
Mobilization Worksheet |
allows you to calculate the cost of moving equipment to and from the project. Using this worksheet, you can calculate the labor and equipment required to move the equipment and the amount of time required. This is the same worksheet as on the project indirects screen. The only difference is how the total cost is loaded into the project. On the indirets sheet, the total mobilization cost is loaded into the indirects sheet as a total cost. Within a task, the mobilization cost is loaded as detailed cost items including the lowboy, driver and any other support costs.
|
|