| Report
Type |
Description |
| Summary Spreadsheet |
A spreadsheet style report showing a unit
cost breakdown for each pay item. |
| Bid Report |
A report showing the bid prices for each
pay item. |
| Environment Listing |
A listing of all the set up options for a
project. |
| Balance Report |
Shows all where you have balanced or
unbalanced your bid. |
| Task Detail Report |
This report can list all the task detail
and pay item detail within the project, showing production rates,
detailed crew costs, and summary pay item costs. |
| Sub/DBE Report |
A listing of all the subs or DBEs used in
the project along with the pay items they were used in. |
| Material Detail Report |
A detailed listing of all the material and
supplies utilized within the project. This report can also show
all the raw materials required for any asphalt used in the project. |
| Metric Conversion Report |
This report will list both the Metric and
English quantities and prices for each pay item. |
| Alternates Report |
A report showing the pay items and prices
included in each alternate with the project. |
| Sub Pricing Sheets |
A report showing the detail sub or supplier
quotes that have been received on the project as well as which prices
were actually used in the bid. |
| Lab/Equip Utilization |
This report will list all the labor or
equipment utilized within the project as well as a summary of all labor
or equipment costs. |
| Indirects Report |
Lists the project indirects that have been
entered for the project as well as the pay items that this cost has been
spread into. |
| Profit Analysis |
This report allows you to see what effect
balancing the bid will have in conjunction with take-off quantities
(that vary from pay quantities) will have on the profit for a project. |
| Foreman's Report |
This report lists all the crew make up,
materials, and production rates within each task. This report does not
list costs. |
| Budget Report |
This report will show the costs included in
each phase code (cost code) that will be used in creating the project
budget. |